Ductus

Skip navigation

Bike Station

2022

Infrastructure

Construction volume: 4.105m³

Area: 1.025m²

Status: Completed

Phases

  • 32 Building Design / Cost estimate
  • 33 Building permission application
  • 41 Tendering
  • 51 Execution drawings
  • 52 Cost control
  • 53 Commissioning and documentation

The bike station is embedded as a solid volume between train station and public square.
The elevator is an integral part of the structure – made of galvanized steel profiles, open in construction, structurally legible.

Board-marked concrete defines the surface.
Inside, color and technical elements provide orientation: a blue ceiling, red floor markings – zones for bicycles, paths to the stairs and the elevator.

CNS pipes run visibly through the space – functionally integrated, part of the system.

The structure connects mobility, orientation, and construction.